Previous Photo
Photo 15 of 19
Next Photo
Begin slide show
Work continues on Sea Lion Sound, Tuesday, October 25, 2011, which is slated to open sometime in summer 2012 at the Saint Louis Zoo.  
The new 10,400-square-foot facility will include an 830-seat amphitheater, a year-round outdoor pool and an underwater glass tunnel for visitors so they can view the sea lions up close in their habitat. 

Photo by Stephanie S. Cordle, scordle@post-dispatch.com
Caption: Work continues on Sea Lion Sound, Tuesday, October 25, 2011, which is slated to open sometime in summer 2012 at the Saint Louis Zoo. The new 10,400-square-foot facility will include an 830-seat amphitheater, a year-round outdoor pool and an underwater glass tunnel for visitors so they can view the sea lions up close in their habitat. Photo by Stephanie S. Cordle, scordle@post-dispatch.com Album ID: 1351648 Photo ID: 38571888
This is a low-resolution representation of a high-resolution photo suitable for print reproduction. If the image displayed above is color - the print will be color. If the image displayed above is black and white - the print will be black and white. This preview does not represent high image quality of the products that can be ordered from this site. Unauthorized reproduction of this image prohibited by law. Watermarks do not appear on the final product.