Previous Photo
Photo 3 of 16
Next Photo
Begin slide show
Signs dangle from the ceiling as demolition is underway on the old Spence Road Branch of the St. Charles City-County Library District.  Construction began on the new library building in July 2011. It was built directly behind the old building and should open in January 2012. The new library will be 54,701 square feet and have two floors. Photos taken Thursday, Dec. 1, 2011.
Emily Rasinski,  erasinski@post-dispatch.com
Caption: Signs dangle from the ceiling as demolition is underway on the old Spence Road Branch of the St. Charles City-County Library District. Construction began on the new library building in July 2011. It was built directly behind the old building and should open in January 2012. The new library will be 54,701 square feet and have two floors. Photos taken Thursday, Dec. 1, 2011. Emily Rasinski, erasinski@post-dispatch.com Album ID: 1374959 Photo ID: 39207822
This is a low-resolution representation of a high-resolution photo suitable for print reproduction. If the image displayed above is color - the print will be color. If the image displayed above is black and white - the print will be black and white. This preview does not represent high image quality of the products that can be ordered from this site. Unauthorized reproduction of this image prohibited by law. Watermarks do not appear on the final product.